Tuesday, April 26, 2011

More progress


All of the interior doors are now in place. Here's a look at two of them through a framed wall in the second bedroom. The left one is in the third bedroom. They both lead to the half bath.


And I finally have electricity where it should be: at the breaker box in the utility room.


Here's the meter box awaiting it's hookup by the power company. They came the next day.


The nearly level area behind the house is a result of hours of work by Sandy after the power line was buried.

Before the contractor filled in the trench I was able to drop in another drainage line to take runoff down the hill to the east toward the driveway.